Free calculator
Square-foot quote estimator
Price cleaning, painting, or flooring work from area, production rate, materials, and a loaded crew rate, then add overhead and a target margin. Starting-point profiles are provided so you can edit them — they are not recommended or average market rates.
Quote
Priced to the target margin you entered.
- Estimated hours —
- Labor —
- Materials & supplies —
- Direct costs —
- Overhead —
- Total job cost —
- Quote price —
- Price per sq ft —
- Gross profit —
- Implied markup —
- Margin —
How to use this calculator
Hours = (square footage ÷ production rate) × the prep/difficulty multiplier. Labor cost is hours × the crew’s loaded hourly rate. Materials are (dollars per square foot × area) plus any flat supply allowance. Overhead is a percent of labor plus materials. The quote is total cost ÷ (1 − margin), and price per square foot is the quote divided by area. The difficulty multiplier applies only to time, not to materials; if a tougher job also uses more product, raise the material allowance or the flat supply amount.
The cleaning, painting, and flooring profiles are editable starting points so you can see the fields filled in. They are not market surveys, recommended prices, or typical production rates. Replace every figure with your own. For a job that is easier to price as hours and a material lump sum, use the job quote calculator instead. Nothing you type is stored or uploaded.
A worked example
The default painting figures are 1,200 square feet, 150 square feet per hour, a difficulty of 1.0, $0.35 per square foot in materials, a $55 loaded crew rate, 15% overhead, and a 35% target margin. Hours are 1,200 ÷ 150 = 8. Labor is 8 × $55 = $440. Materials are 1,200 × $0.35 = $420. Direct cost is $860. Overhead is 15% of $860, or $129. Total cost is $989. The quote that holds a 35% margin is $989.00 ÷ 0.65 = $1,521.54, which is $1.27 per square foot. Gross profit is $532.54, a 53.85% markup.
If the same room needs more prep and you set difficulty to 1.2, hours become 9.6, labor $528, total cost $1,090.20, and the 35% margin quote becomes $1,677.23, or $1.40 per square foot.
Common pricing mistakes
Quoting “a price per square foot” without checking hours and materials can hide a slow production rate or a thin material allowance. A difficulty or second-coat adjustment that is skipped has the same effect. Keep the production rate and the crew rate on the same basis: if the rate is for a two-person crew, the square feet per hour should also be what that crew completes together, not what one person completes.
Mixing up markup and margin still applies. A 35% markup on a $989 cost is $1,335.15, which is only a 25.93% margin — not the 35% margin held by $1,521.54. See the markup vs. margin calculator for the conversion. These results depend on the numbers you enter and are not a recommended price or a guarantee of profit.
Questions
Are the trade profiles average rates?
No. They are only starting points so the form is not empty. Production, material cost, and labor vary by market, finish, access, and crew. Use your own figures.
Does the difficulty multiplier change materials?
No. It only increases estimated hours. If a harder job also uses more paint, cleaner, or adhesive, raise the per-square-foot allowance or add a flat supply amount.
Should I use one person’s rate or the whole crew’s rate?
Use a loaded cost for whoever is included in the production rate. A $55 rate at 150 square feet per hour should describe the same person or crew. If two people work together, enter their combined loaded cost and the square footage that pair completes in an hour.
Can I use this for a trade that is not listed?
Yes. Choose Custom rates and enter square footage, production, materials, and labor for the work you do — any service job you price by area.
To reuse this math on estimates and invoices, see the Job Quoting Kit — a $29 one-time workbook and PDF guide.
Educational tool only. Not financial, tax, legal, or business advice. No result is guaranteed.